Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />~.a~~~~t arib ~~cot«~~ <br />CANSULTING GEOTECHNICAL ENGINEEPS ANO MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M98209MT DATE: Tuesday, 9-22-98 <br />PROJECT NAME: west slk Mine Gob Pile <br />PROJECT LOCATION:SOmerset, Colorado <br />CLIENT: Chesnik construction <br />CONTRACTOR: Chesnik Construction <br />TECHNICIAN: Glendening <br />WEATHER CONDITIONS: sunny <br />WORK REQUESTED: Density <br />tests <br />FOREMAN: <br />Plr. Chuck Chesnik <br />WORK PERFORMED Y LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 9:30 A.M. as requested by Mr. Chuck Chesnik. <br />I performed soil density tests as requested by Mr. Chesnik of material being <br />placed on gob pile using nuclear soil density test methods. Please refer to the <br />test results sheets for approximate test locations and test results. The test <br />area was determined by Mr. Chesnik. The test results indicate only the relative <br />compaction and soil moisture content of the material tested at the elevation <br />and location tested at the time of our site visit. <br />;~`~ ~ ~'~ <br />~- <br />P. 0. SOX 76N P. O. SOX 0018 711 SODO D0. <br />ONAND JUNGTIOµ 00 01607 I60lRNO60. CD 07107 DURANOO,CO 61701 <br />(670) t1i66M (670) 716.7161 (970) 7SP6066 <br />