My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37620
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:41 PM
Creation date
11/23/2007 9:14:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
General Documents
Doc Date
6/21/1983
Doc Name
MUNGER CANYON PERMIT STIPULATIONS FN C-020-81
From
MLRD
To
SHERIDAN ENTERPRISES INC
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ <br />Mr. William Bosworth -3- June 21, 1983 <br />Stipulation No. 14: This stipulation concerns an annual revegetation <br />monitoring proyram. The monitoring program proposed by Salt Creek is <br />acceptable to the Division. Upon completion of revision of the permit <br />application, the Division will consider this stipulation satisfied. <br />St' ulation No. 15: This stipulation concerns an aerial raptor survey <br />t en July 1 and July 15 in both 1983 and 1984. Reports on this survey <br />are d !! on August 15, 1983 and August 15, 1984. <br />S ip lation No. 16: This stipulation concerns energy dissipation in <br />Mu er Creek. A satisfactory response has been received, therefore, the <br />D' is' n considers this stipulation resolved. <br />tipulation No. 17: This is an ongoing stipulation concerning erecting <br />'DANGER" signs along the haul road. This stipulation will remain in <br />effect until the upgraded haul road is completed. <br />Stipulation No. 18: This is an ongoing stipulation concerning haul road <br />drainage culvert spaciny. This stipulation must be resolved prior to <br />construction of the haul road. <br />Stipulation No. 19: This stipulation concerns the reclamation bond. A <br />bond in the amount of $301,000.00 has been received, therefore, this <br />stipulation is resolved. <br />In summary, stipulations 1, 3, 5, 7, 17, and 18 are ongoing with no <br />specific completion date; stipulations 9, 10, 14, 16, and 19 have been <br />satisfied; additional information and/or revision of the permit <br />application is needed to resolve stipulations 4, 6, 11, 12, and 13; <br />stipulation 2 is due July 12, 1983; stipulation 8 is due January 12, 1984 <br />and; stipulation 15 is due on August 15, 1983 and August 15, 1984. <br />Please review the status of each stipulation. If you disagree with the <br />above discussion or have any questions, please call me. <br />~ncerely, <br />Ji Herron <br />clamation Specialist <br />cc: f-tr. John Walters <br />JH/ih <br />Doc. No. 3644 <br />
The URL can be used to link to this page
Your browser does not support the video tag.