Stipulation #18 <br />Due to the recalculated volume of the temporary overburden stockpile, and due to the possibility <br />of not obtaining the Sudduth lease, Kerr Coal must demonstrate within 90 days of permit <br />renewal that approximate original contour can be achieved. This submittal must include all <br />applicable maps, tables and pertinent calculations to fully demonstrate the achievability of aoc. <br />Status: Terminated 12-9-1992. <br />Stipulation # 19 <br />Kerr Coal has submitted detailed bonding liability cost estimates in response to the Division's <br />preliminary determination. The Division is reviewing bond liability estimates submitted by Kerr <br />and the Division in conjunction with Kerr, the Division is to make a determination of cost <br />estimates to be used in estimating the total bond amount. Total bond for the mine site (15` <br />increment) is set at $4,290,800.00 and Ken• is to maintain a bond in that amount in full force and <br />effect no later than 60 days after issue of the Division's decision on permit renewal. The <br />Division will determine additional amounts which may be required, if any, for the Kerr site. <br />Status: Terminated 2-25-1993 <br />Stipulation #20 <br />Kerr Coal Company will continue to work with the Division to establish the reclamation liability <br />amount. When an amount is agreed upon, this amount will be submitted as a new bond or rider <br />to the existing bond pursuant to Rule 3.02. <br />Status: Terminated 5-14-1996 <br />Stipulation #21 <br />Within 30 days of approval of MR25, Kerr Coal Company will submit text page 816-1758, <br />clarifying that map 29 depicts the tipple azea haul roads only and that haul roads A and B were <br />modified via MR-25 to permanent light use roads, as depicted on map 28A -Mine Area Existing <br />Structures. Map 28A should be cleazly labeled to show that both previous haul road segments <br />aze now permanent light-use roads. The revision number should be included at the bottom of the <br />text pages. Text should be added discussing reclamation sequence. <br />Status: Complied with 11-28-1995 <br />Stipulation #22 <br />The operator is required to provide a complete inventory of all wells within the permit boundary <br />including the following: (A) well log and completion information, including borehole diameter, <br />casing type, well depth, gravel pack and grout intervals; (B) ground conditions including access <br />to wells; (C) water level measurements; (D) depth of each well, condition of borehole/casing <br />and amount of sediment in each well; and (E) a summary of how and when each well will be <br />sealed. <br />Status: Terminated 1-30-2002 <br />Marr Mine Permit Renewa105 <br />17 March 2006 <br />-5- <br />