My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37421
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:33 PM
Creation date
11/23/2007 9:09:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
3/17/2006
Doc Name
Proposed Decision & Findings of Compliance RN5
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation #12 <br />No later than 90 days prior to the scheduled commencement of operations on the second bonding <br />increment (shown map 48) Kerr must submit detailed worst case reclamation cost estimates to <br />the Division for review. Any required additional bond amount must be submitted and approved <br />prior to the commencement of operations on that increment. A similaz procedure shall be <br />followed for any subsequent increments. This stipulation was replaced by #15 of the 1986 permit <br />renewal. <br />Status: Terminated 9-9-1991 <br />Stipulation #13 <br />Kerr Coal is required to construct all ditches using the design grades rather than the grades shown <br />on map 16. If this requires relocating any ditches from the locations shown on the map, then a <br />revised map 16A must be submitted at that time. <br />Status: Terminated 5-14-1996 <br />Stipulation #14 <br />Ken Coal is directed to submit to this Division on a regulaz basis, data from the aerial volumetric <br />surveying program described on page 816-124 of the original application to determine whether <br />future operational experience is consistent with the projected swell factor of 24%. <br />Status: Terminated 4-9-1990 <br />Stipulation #15. No later than 90 days prior to the scheduled commencement of operations on <br />the 2nd bonding increment (shown on map 46) Ken Coal must submit detailed worst case <br />reclamation cost estimates to the Division for review. Any required additional bond amount <br />must be submitted and approved prior to commencement of operations on that increment. A <br />similaz procedure shall be followed for any subsequent increments. <br />Status: Terminated 12-9-1992. <br />Stipulation #16. The permittee is required to submit to the Division a yearly report on the <br />progress of all hydrologic monitoring which includes all data collected for that year and a <br />discussion of any conclusions which can be drawn from the data. <br />Status: Terminated 5-14-1996 <br />Stipulation #17 <br />Kerr Coal Company will submit all applicable maps, tables and text which describe the timing <br />and probable sequence of mining operations and reclamation activities as currently projected <br />during the forthcoming permit term. This information must be fully submitted within 90 days of <br />permit renewal. <br />Status: Terminated 12-9-1992 <br />Marr Mine Permit Renewa105 <br />17 March 2006 <br />_¢ <br />