Laserfiche WebLink
SHALL BE PROVIDED WITH DOCUMENTATION THAT ALL NECESSARY RIGHTS OF ENTRY, AS <br />REQUIRED BY SECTION 2.03.6, HAVE BEEN TRANSFERRED TO MOUNTAIN COAL COMPANY, <br />LLC. <br />STATUS: COMPLIED WITH 7/2/1998. <br />Stipulation No. 70 <br />ACTIVITIES APPROVED UNDER TECHNICAL REVISION TR-102, NAMELY CONSTRUCTION OF A <br />600-FOOT ACCESS ROAD, CONSTRUCTION OF A DRILL PAD, AND DRILLING OF METHANE <br />DRAINAGE WELL 19-06, MUST NOT BEGIN UNTIL THE COLORADO DIVISION OF MINERALS AND <br />GEOLOGY RECEIVES PROOF OF US FOREST SERVICE APPROVAL OF THESE ACTIVITIES. THIS <br />STIPULATION HAS BEEN ADDED FOLLOWING CONSULTATION WITH THE US OFFICE OF <br />SURFACE MINING, AND RECOGNIZES THE ONE-TIME UNIQUE SITUATION CREATED FOR <br />MOUNTAIN COAL COMPANY BY THE COMBINATION OF THE IMMEDIATE NEED TO PROVIDE <br />FOR MINE WORKER SAFETY, THE NEED TO COMPLETE THESE ACTIVITIES BEFORE NOVEMBER <br />30 200$ SO AS TO COMPLY WITH USFS SURFACE DISTURBANCE RESTRICTIONS, AND THE <br />SEPTEMBER 16 200$ NINTH CIRCUIT COURT DECISION (CASE NO. CIV-F-03-6386 JKS; DOCKET <br />NO. 79) CREATING A NEW COMMENT PERIOD FOR THE USFS APPROVAL PROCESS FOR THESE <br />PROPOSED ACTIVITIES. <br />STATUS: COMPLIED WITH 12/22/200$ BY SUBMITTAL OF TR-102. <br />Stipulation No. 71 <br />ACTIVITIES APPROVED UNDER MINOR REVISION MR-319, NAMELY CONSTRUCTION OF A 1.0 <br />ACRE DRILL PAD, CONSTRUCTION OF A LIMITED-EXTENT LIGHT-USE ROAD, AND DRILLING OF <br />BOREHOLES 24HS-O1, 24HS-02, AND 24HS-O3 TO FACILITATE DELIVERY OF WATER FOAM <br />AND NITROGEN INTO THE MINE, MUST NOT BEGIN UNTIL MOUNTAIN COAL COMPANY <br />RECEIVES US FOREST SERVICE APPROVAL FOR THESE ACTIVITIES. THIS STIPULATION <br />RECOGNIZES THE URGENT AND SOMEWHAT UNIQUE NEED BY MOUNTAIN COAL COMPANY <br />TO DRILL THESE BOREHOLES IMMEDIATELY UPON RECEIPT OF USFS APPROVAL. <br />STATUS: COMPLIED WITH 10/21/200$ BY SUBMITTAL OF MR-319. <br />Stipulation No. 72 <br />ACTIVITIES APPROVED UNDER MINOR REVISION MR-320, NAMELY CONSTRUCTION OF A O.4S- <br />ACRE DRILL PAD AND DRILLING OF TWO BOREHOLES TO FACILITATE MONITORING/SAMPLING, <br />INJECTING WATER, FOAM AND NITROGEN INTO THE MINE, MUST NOT BEGIN UNTIL MOUNTAIN <br />COAL COMPANY RECEIVES US FOREST SERVICE APPROVAL FOR THESE ACTIVITIES. THIS <br />STIPULATION RECOGNIZES THE URGENT AND UNIQUE NEED BY MOUNTAIN COAL COMPANY <br />TO DRILL THESE BOREHOLES IMMEDIATELY UPON RECEIPT OF USFS APPROVAL. <br />STATUS: COMPLIED WITH 10/31/200$ BY SUBMITTAL OF MR-320 <br />19 <br />