My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-13_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2007-02-13_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 6:50:10 AM
Creation date
11/23/2007 9:08:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
2/13/2007
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 65 <br />THE DIVISION SPECIFICALLY DOES NOT APPROVE ADDITIONAL DISTURBANCE TO THE <br />SYLVESTER GULCH STREAM CHANNEL AS A RESULT OF THE TEMPORARY PIPE <br />INSTALLATION. THE DIVISION DIRECTS MCC TO PLACE THE PIPE ONTO THE CHANNEL <br />BOTTOM WITHOUT EXCAVATION IN OR NEAR THE STREAM AND WITHOUT CONSTRUCTING A <br />CORRIDOR FOR THE PIPE AS ORIGINALLY PROPOSED IN MCC'S MINOR REVISION NO. 221 <br />APPLICATION, DATED 7ULY 11, 1997. <br />STATUS: COMPLIED WITH 8/19/1997. <br />Stipulation No. 66 <br />THE APPLICANT MUST NOT DISCHARGE ANY FLUIDS FROM THE DRILL HOLES OR <br />PIEZOMETERS PROPOSED FOR INSTALLATION WITH MINOR REVISION NO. 226 UNTIL ALL <br />NECESSARY APPROVALS AND/OR PERMITS HAVE BEEN OBTAINED FROM THE COLORADO <br />DEPARTMENT OF HEALTH AND ENVIRONMENT, WATER QUALITY CONTROL DIVISION <br />(WQCD.) THE DIVISION [S APPROVING THE INSTALLATION OF TWELVE (I2) <br />BOREHOLES/PIEZOMETERS. ONCE THE NECESSARY APPROVALS HAVE BEEN OBTAINED FROM <br />WQCD, THE DIVISION WILL APPROVE DISCHARGE OF FLUIDS TO AN EXISTING ON-SITE <br />SEDIMENTATION POND. <br />STATUS: COMPLIED WITH 10/8/1997. <br />Stipulation No. 67 <br />WITHIN 60 DAYS OF APPROVAL OF MR225, MCC MUST SUBMIT REVISED MODELS FOR POND <br />MR-2R. THE REVISED MODELS MUST REFLECT THE ADDITION OF DISTURBED AREA WHICH <br />WILL RESULT FROM THE CONSTRUCTION OF THE WATER TANK TOPSOIL PILE. THE REVISED <br />MODELS MUST BE SUBMITTED AS A MINOR REVISION TO THE PERMIT AND MUST BE RECEIVED <br />BY DECEMBER 20, 1997. <br />STATUS: COMPLIED WITH 2/2/1998 BY THE SUBMITTAL OF MR-235. <br />Stinulation No. 68 <br />WITHIN 90 DAYS OF CONSTRUCTION OF THE SUBSURFACE DRAINAGE STRUCTURES <br />PROPOSED IN MINOR REVISION NO. 239, MCC SHALL SUBMIT DESIGNS FOR THE POND MB-1 <br />SURFACE DRAINAGE SYSTEM WHICH INCLUDES FLOW FROM THE SUBSURFACE DRAINAGE <br />SYSTEM. <br />STATUS: COMPLIED WITH $/13/1999. <br />Stinulation No. 69 <br />WITHIN I S DAYS OF CONSUMMATION OF THE TRANSFER OF THE WEST ELK MINE PERMIT <br />FROM MOUNTAIN COAL COMPANY TO MOUNTAIN COAL COMPANY, LLC, THE DIVISION <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.