My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-02_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2006-06-02_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 6:42:21 AM
Creation date
11/23/2007 9:08:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/2/2006
Doc Name
Proposed Decision & Findings of Compliance for PR10
From
E-Seam Longwall Mining & Development of South of Divide Area
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO THE DIVISION AN ANNUAL HYDROLOGIC REPORT. THIS REPORT SHALL INCLUDE AN <br />ANALYSIS OF ALL HYDROLOGIC DATA GATHERED DURING THE YEAR, AN ASSESSMENT OF <br />THE [MPACTS OF MINING DURING THE YEAR, AND AN ESTIMATE OF THE PROJECT IMPACTS OF <br />MINING IN THE FOLLOWING YEARS. THIS REPORT SHALL ASSESS THE IMPACTS OF MINING ON <br />THE QUALITY AND QUANTITY OF WATER IN THE SURFACE STREAMS, SPRINGS, <br />GROUNDWATER AQUIFERS, MINE INFLOW AND MINE DISCHARGE. <br />STATUS: TERMINATED 5/28/1992. <br />Stipulation No. 29 <br />WITHIN NINETY DAYS (9O) OF APPROVAL OF THE LOWER WASTE PILE PERMIT REVISION, <br />MCC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES MONITORING OF <br />THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF THE SEDIMENT POND AND <br />UNDERDRAIN DISCHARGE TWICE PER YEAR DURING THE SECOND AND THIRD QUARTER OF <br />THE YEAR. THE PARAMETERS SHALL BE THE FULL LIST OF CHEMICAL CONSTITUENTS, AT <br />LEAST FOR THE FIRST YEAR. MCC MAY REQUEST AN ADJUSTMENT OF THE MONITORING <br />REQUIREMENTS AFTER THE FIRST YEAR, DEPENDING ON THE RESULTS OF THE MONITORING. <br />STATUS: COMPLIED WITH 5/19/1986. <br />Stipulation No. 30 <br />MCC MUST SUBMIT ADDITIONAL BOND IN THE AMOUNTS DESCRIBED IN THE LOWER WASTE <br />P[LE PERMIT REVISION APPLICATION, AT LEAST THIRTY (3O) DAYS PRIOR TO THE <br />COMMENCEMENT OF THE CONSTRUCTION OF PHASES III, IV, AND V OF THE LOWER WASTE <br />PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE DIVISION <br />PRIOR TO THE CONSTRUCTION OF THESE PHASES. <br />STATUS: TERMINATED $/28/1992. <br />Stipulation No. 31 <br />MCC SHALL FORWARD FIVE (S) COPIES OF THE COLORADO DEPARTMENT OF HIGHWAY'S <br />WRITTEN APPROVAL FOR ACTIVITIES WITHIN lOO FEET OF THE OUTSIDE RIGHT-OF-WAY OF <br />THE COLORADO HIGH WAY 133 WITHIN THIRTY (3O) DAYS OF THE APPROVAL OF THE PERMIT <br />REVISION APPLICATION. <br />STATUS: COMPLIED WITH $/19/1986. <br />Stipulation No. 32 <br />THE APPLICANT SHALL MONITOR THE TWO MONITORING WELLS LOCATED OVER THE FIRST <br />PANEL TO BE SUBSIDED ONE YEAR PRIOR TO MINING THIS PANEL. THE APPLICANT SHALL <br />SUBMIT TO THE REGULATORY AUTHORITY GROUNDWATER LEVEL DATA AND WATER <br />QUALITY DATA PRIOR TO MINING THIS PANEL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.