Laserfiche WebLink
STATUS: COMPLIED WITH 3/19/I986. DATA FROM THE USGS MONITORING STATION IS <br />INCLUDED IN THE ANNUAL HYDROLOGY REPORT. <br />Stipulation No. 23 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVISION COPIES OF THE REPORTS, <br />EXHIBITS AND ALL SUBSEQUENT AMENDMENTS SUBMITTED TO THE GUNNISON COUNTY <br />PLANNING COMMISSION, TITLED PROTECTION OF MINNESOTA CREEK WATER SUPPLY. <br />STATUS: TERMINATED 7/17/1987. <br />Stipulation No. 24 <br />ALL DATA AND REPORTS SUBMITTED TO THE STATE ENGINEER'S OFFICE AND DITCH <br />COMPANIES SHALL BE COPIES TO MLRD AS INCLUSIONS WITHIN THE QUARTERLY REPORT <br />REQUIRED UNDER SECTION 4.05.13(2) OF THE RULES AND REGULATIONS. <br />STATUS: COMPLIED WITH 5/1911986. <br />Stipulation No. 25 <br />WEST ELK COAL COMPANY SHALL SUBMIT WITHIN NINETY (9O) DAYS OF THE APPROVAL OF <br />THE WASTE PILE PERMIT REVISION A PLAN TO MONITOR THE FORMATION OF A PERCHED <br />AQUIFER WITHIN THE WASTE PILE. MONITORING SHALL INCLUDE STANDARD WELL WATER <br />QUALITY PARAMETERS AND WATER LEVEL MEASUREMENTS. THE PLAN SHALL BE <br />IMPLEMENTED UPON APPROVAL BY THE DIVISION <br />STATUS: COMPLIED W[TH 5/19/1986. <br />Stipulation No. 26 <br />THE APPLICANT'S MONITORING REPORTS SHALL CONTINUE TO INCLUDE QUALITY AND <br />QUANTITY MONITORING OF ALL DISCHARGES FROM THE MINE SITE. WATER QUALITY <br />MONITORING SHALL CONSIST OF THE EFFLUENT LIMITATIONS PLUS TOTAL DISSOLVED <br />SOLIDS. <br />STATUS: TERMINATED 7/17/1987. <br />Stipulation No. 27 <br />This stipulation was never used. No stipulation No. 27 exists. <br />Stipulation No. 28 <br />MCC OR ANY SUCCEEDING OPERATOR OF THE WEST ELK MINE MUST CONTINUE TO SUBMIT <br />1~ <br />