Laserfiche WebLink
material from the slump/slide that is being carried by water and deposited on areas of the <br />mine bench that was not impacted by the slump/slide. A total civil penalty of $750.00 was <br />paid by the operator on May 20, 1993. The violation was terminated on June 28, 1993. <br />SECTION II -REVISIONS TO THE PERMIT <br />The following minor and technical revision have been processed since the permit renewal <br />was completed in December 1992: <br />Minor Revision Summary <br />Minor Revision Description Decision/Date <br />MR-6 Addition of revised runoff AP 8/25/92 <br />calculations <br />MR-7 Install silt fence AP 5/14/93 <br />immediately be]ow <br />slump/slide <br />Technical Revision Summary <br />Technical Revision Description Decision/Date <br />TR-8 1992 Renewal Issues AP 12/18/92 <br />TR-9 Repair of slope failures on AP 8/26/93 <br />mine bench <br />TR-10 Discontinue monitoring of AP 8/19/94 <br />P-6 <br />SECTION III -STATUS OF STIPULATIONS <br />No stipulations have been added to the Blue Ribbon Mine permit since the renewal in 1992. <br />All stipulations previously added to the permit have been complied with. Details regarding <br />stipulation resolution can be found in a memorandum to the file dated August 1, 1992. <br />SECTION IV -PERMIT VARIANCES <br />The Blue Ribbon Mine permit does not involve any variances regarding mountaintop <br />removal or the achievement of approximate original contour. There were no experimental <br />3 <br />