My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37236
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:27 PM
Creation date
11/23/2007 9:03:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
General Documents
Doc Date
11/20/1985
Doc Name
CASH MINE FN 83-141
From
GOLD HILL VENTURES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~' <br />• R <br />~II ~I"I~'I~""fII ~LP.OILBox 1VENTURES <br />Longmont, Colorado 80501 <br />AE~E11/ED <br />November 14, 1985 <br />Edward L. Bischoff <br />Minerals Supervisor <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Cash Mine, File M-83-141 <br />Dear Mr. Bischoff: <br />Northeast Resource Arse <br />Building 41, Denrer Fed. Center <br />P.O. Box 25047 <br />Derner, CO 80225-0047 <br />NOV 2 015 <br />Qda. Dyt. d Al~tur~l ApgIW'~6 <br />This letter is being submitted t <br />Reclamation Division in response to e Amendment Conditions <br />attached to the Cash Mine Limited Im ~i~_..._t-_rr__.-o_a .... <br />September 26, 1985, by the Mined Land Rec am oar <br />1. The initial tailings impoundment storage area will <br />occupy a rectangular shaped area that will have the dimen- <br />sions 275 feet by 100 feet at its longest and widest points. <br />This size was determined after surveying the outline of the <br />tailings impoundment dam in the field, and deciding to take <br />advantage of the natural topography and ground conditions to <br />build a smaller but deeper tailings retention structure. <br />The tailings dam will extend 330 feet along its outer face <br />from the northeastern edge to the southwestern edge of the <br />structure. By reducing the initial length of the tailings <br />impoundment dam, the entire site will be well screened from <br />public view from County Road No. 52 by the existing growth <br />of mature pine and aspen trees. A revised Millsite and <br />Tailings Pond Reclamation Plan Map that will reflect this <br />change will be submitted to the Mined Land Reclamation <br />Division as soon as the site work has been completed. <br />Once the tailings dam construction earth work has been <br />completed, the following sequence of geomembrane liner <br />installation will be followed: <br />1. The water decantation line and any seepage <br />monitoring lines will be placed in position along the <br />bottom of the tailings pond prior~to preparing the <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.