Laserfiche WebLink
<br /> <br />Technical revisions <br />22 - deletion of zinc and addition of settleable solids to water <br />quality analysis <br />25 - revised blasting schedule <br />26 - tree planting for windbreak <br />29 - disposition of excess topsoil <br />30 - temporary diversions <br />31 - topsoil handling in previously regraded areas <br />32 - shrub species for drainage stabilization <br />unumbered - deletion of land from permit area <br />24 - extension of disturbance within permit area for 2 years of <br />mining. <br />Minor revisions <br />- minor changes to seed mixes and tables <br />- change in marking drill holes <br />- revegetation methodology and vegetative survey changes <br />- sediment pond cleaning timeframes <br />- survey of golden eagles and prairie falcons <br />- haul road plans (reference NOV C-84-160) <br />- rill and gully repair <br />- increase in ash disposal in pits <br />- small windbreak construction <br />- ANFO storage site <br />0869M <br />