My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37150
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:24 PM
Creation date
11/23/2007 9:00:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
12/11/1997
Doc Name
Proposed Decision & Findings of Compliance for SL1
From
Phase I
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRI did not request bond release for the Third North ventilation shaft and the NW-1 bleeder fan in <br />this bond release application. The bond amount associated with each of [hese facilities is included in <br />the subtotal amount of $1,153,959.00. Therefore, as shown in Table B below, to determine a bond <br />amount for which this Phase I bond release request is applicable, these costs need to be removed <br />from the current reclmation liability. <br />Table B <br />Permitting Action/Item Associated bond <br />amount Subtotal <br />(TR-l4) Third North Vent ($8,414.00) $1,145,545.00 <br />(TR-IS) NW-I Vent ($17,421.00) $1,128,124.00 <br />TOTAL (for 60%calculation) $1,128,124.00 <br />Therefore, the applicable bond amount subject to the 60% criteria as specified in Rule 3.03.1(2)(a) is <br />- $1,128,124.00. <br />BRI applied for Phase I bond release under the Colorado Surface Coal Mining Reclamation Act <br />following reclamation of the Golden Eagle mine. An application for Phase (bond release was <br />received by the Division on September 3, 1997. The application was deemed complete on <br />September l0, 1997, as BRl filed proof of publication of the public notice concurrent with the <br />application. BRI published notice of the bond release application in Chronicle News once weekly <br />for four consecutive weeks, beginning July 15, 1997. BRI also notified land owners within and <br />adjacent to the mine permit area, and other interested parties, of the application for bond release, as <br />required by Rule 3.03.2((). <br />One private landowner in the adjacent Rancho Escondido development objected to the bond release <br />request. This objection was received August 11, 1997. This landowner was not adjacent to the <br />disturbed area subject to the bond release but was adjacent to the large block of land owned by~Rl. <br />Furthermore, the objection was not concerning the reclamation work performed at the main mine <br />facility area. The landowner was objecting to reclamation work performed on his property under a <br />Notice of Intent (NOI). As stated above, ac[ivities transferred to a Notice of Intent under TR-47 are <br />excluded from this bond release and remain fully bonded at this time. On behalf of this landowner, <br />the Rancho Escondido Property Owners Association (REPOA) requested an informal conference on <br />August 29, 1997. On September 10, 1997, the Division notified REPOA that the landowners <br />concerns were not part of this Phase I bond release request and that no bond monies would be <br />released concerning reclamation on this landowners property. On October 3, 1997, the Division <br />received a letter from REPOA withdrawing their request for an informal hearing. The Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.