Laserfiche WebLink
4 <br /> trend develops that shows degradation of the alluvial water quality that exceeds historical <br /> quality. <br /> This plan is outlined on page 7 of Tab 13 in the permit application. <br /> 2. Although Dry Creek is an intermittent stream, the operator has committed to establishing a <br /> stream buffer zone on that section of Dry Creek that is located within the permit boundary. <br /> This commitment is discussed on page 3 of Tab 14 and page 4 of Tab 21. <br /> SECTION VI - BONDING SUMMARY <br /> The Hayden Gulch Loadout has an appro the Division. The bond.is a corporate <br /> surety, number 645100808349BCA, for $696,724.00, issued by the Aetna Casualty and Surety <br /> Company. This midterm contains adequacy questions in Section IV that may result in a revision of <br /> the bond liability. <br /> vtGLDovr.mT <br /> -6- <br />