Laserfiche WebLink
Kent Gorham <br />October 17, 1996 <br />Page 2 <br />2. Topsoil pile TSS will be used to reclaim the substation site on the east road. <br />3. The topsoil piles for the 3rd-road N, 3rd N fan site and NW#1 fan site will be transferred <br />to Stroud Oil for their use in final reclamation. <br />4. The bioremediation soil will be used to supplement the recalmation in the tipple/loadout <br />area. <br />By the time this letter reaches you, formal applications for concrete disposal and the change in <br />the outslope for the waste disposal pile should have been received by your office. <br />!f you have any questions please call me at (406) 748-5186 or Ron Thompson a[ the site. <br />Sincerely, <br />~G~~ <br />Botl Mont ome <br />g ry <br />Environmental Supervisor <br />pc: Ron Thompson, Basin Resources <br />is\msofl ice\winword\rm\ 165? 1096.co1 <br />