Laserfiche WebLink
Mr. James B. McArdle -2- April 25, 1984 <br />The above described design will require a substantial construction <br />effort which is scheduled to begin about mid-1984. Our plans for <br />this construction include the following sequence of events: <br />o Establish initia] design grades for Lower Davis Gulch and <br />Middle Fork channels. <br />o Move a portion of the Lower Davis Gulch "excess fill" <br />(900,000 cu. yds.) to the mine bench area and backfill and <br />compact the primary crusher excavation to final design grade. <br />o Regrade Lower .Davis Gulch according to design. <br />o Establish final Lower Davis Gulch and Middle Fork channels <br />as designed. <br />Exxon believes that this design satisfies the sixth stipulation <br />placed on our Interim Site Plan as described in Mr. Jim Pendleton's <br />letter to you of December 21, 1982. <br />Please contact me if you have any questions regarding these <br />construction projects. <br />Very truly yours, <br />Mr. R. E. Niemela <br />Regulatory Affairs Advisor <br />REN:eab <br />