Laserfiche WebLink
Monitoring_We1166 <br />Bowie wants to reroute the access road to the project area on the down hill side of <br />the monitoring wells. They want to cut the slope uphill of the monitoring well <br />and build a pad around the well. <br />GVB 8B <br />There was silt fence present on the topsoil pile in this location and it was buried <br />There is silt fence down slope and it is not buried <br />The mud pit still has water in it and it will probably have to be pumped out in <br />order to reclaim it <br />Pull back the corner of the pad <br />Fill bog hole on the south east side of the pad <br />Mulch and seed down slope and up slope, topsoil pile and pad perimeter in <br />- --general ----- - - - - - - - - - - -- - - <br />Finish cement job for the surface casing, and weld cap on top <br />Reapply some of the topsoil over areas for reclamation <br />Seed and mulch for reclamation <br />GVB qB <br />Silt fence is installed down slope of the pad (and is working) <br />Silt fence is installed at the base of the topsoil pile <br />The mud pit is dry and ready for reclamation <br />The low area near the hole needs to be built up <br />Pull in the edges of the pad and reduce to monitoring size <br />Finish abandonment of the first hole drilled <br />Cement the annulus of the hole (top off shrink back) <br />Reapply some of the topsoil over areas for reclamation <br />Seed and mulch for reclamation <br />GVB 8A <br />This hole will be used during the wintertime <br />Reclaim the mud pit <br />Extend the silt fence along the down hill side of the mud pit <br />Not much topsoil is present on the site in general <br />The top of the mulch and seeded area may have to be netted to keep the wind <br />from blowing off the reclamation <br />May have success with reclamation if use seed and mulch with certified weed free <br />oat straw with the seed heads present <br />Pull in pad to monitoring size <br />Area up hill of Monitoring_Well 65 <br />This area was used as a staging area, and the ground has been disturbed <br />Seed and mulch this area for reclamation <br />General road observations: Generally Edward and I went over the roads in the <br />project area. They are pretty well constructed and generally drain to the out <br />slope. Major water control and diversion is by rolling dips and grade dips that <br />