Laserfiche WebLink
9708647287 COTTER NUCLR <br />041 P03 MRY 14 '99 10:18 <br />t:o~ Corporation's Mineral Joe Mine, ~77-284 <br />Page 3 -May 14,1999 <br />DMG estimated 4,0331cy for 5 acres for a total cost of 51,560. F'mely textured waste material <br />can be used, as no topsoil was stockpiled at the inception, There is approximately 1,1001cy of <br />top soil stockpiled. Using a Cat 966 Front end loader with an adjusted capacity of 1Si6 lcy/hour <br />and 570 per hour. The estimated cost is S1,441. <br />DMG's cost estimate of 54,554, Cotter agrees with this cost. <br />DMG estimated S1,866. Cotter has deducted 58861iom this estimate because the local <br />contractors do not charge hourly rental rates for their equipment while in transit. Cotter's <br />estimate is S980. <br />DMG estimated 119.45 hour for a cost of 53,552 Cotter agrees with DMG on the Foreman <br />costs. . <br />Based upon the above, Cotter's revised estimate to complete all reclamation activities at the <br />Mineral Joe Mirte is 527,270. <br />Cotter Corporation is also requesting that until a resolution on the finandal warranty issue is <br />reached, that the requ'ved date in the corrective action section of the Division's inspection Report <br />to have the Enancial warranty in place on May 17, 1999 be extended.as necessary. <br />Should you have any questions regarding this transmittal, please do not hesitate to contact me at <br />970.864-7347. <br />Sincerely, <br />C0~ CORP~ N <br />a.L-e <br />Dave Diss <br />Errvitrottmental Tech II <br />DD/tlt <br />amaa~n.ae <br />oc: Dave Munger <br />