9708647287 COTTER NUCLA <br />041 P02 hIAY 14 ' 99 10:17 <br />Co~ Corporation's Mineral Joe lVtine,~77-284 <br />Page 2 -May 14, 1999 <br />Elevated loadout retaining wall. DMG cost estimate 53,602. Cotter's estimate is based on <br />burning the timber in the retaining wall then using a dozer to contour the remaining awcture into <br />final grade. Dozer cost is S100 per hour and should take about 24 hours. Labor: 16 hours at <br />S23.50lhour, for a total wst estimate of 52,776. <br />For the vent hole/shaft concrete pad removal, DMG's cost estimate is 5709. The vecd holelshaft <br />concrete pad can be broken up using a dozer end pushed down the vent hole. Dozer time 3 hours <br />at 5100l1u•., and 8 hours labor at 523.50/hour. Oxygen and acetylene may be required (5108), for <br />a total cost of 5596. <br />There are 7 metal ore bins which can be crushed and pushed down the vent shaft prior to <br />placement of the concrete floor slab. The cost estimate is 4 hours at 5100/bour, or S~I00. <br />Backfill portal -Cotter agrees with the Division's estimate of 5389. There is an additional portal <br />at Mineral Toe 2, this will require an additional S389 for closure, totaling 5778. <br />Ventholelshaft closure -The DMG cost estimate to bacl~ll the venthole is 5389, Cotter agrees <br />with this cost. <br />DMG's cost estimate is S1,326 for a prefab concrete panel Cotter proposes using a portion of <br />the compressor building floor or a portion of the shop floor at Mineral Joe 12, as mentioned in <br />task #i. Equipment wst: Front end loader 57011rour for 4 hours and dozer cost of 5100/hour for <br />4 hours. For a total cost of 5680. <br />6" I beams for the vent hole closure. DMG estimates 5600 or S50 per foot. Local supplier wst is <br />S4.OOJft x 30 ft. or S120. <br />DMG's cost estimate is 51,978 to move 5,9601cy of material using a Cat 320 excavator. Cotter <br />suggests using a D-8 dozer at 5100 per hour, with an adjusted production rate of 458 ley per <br />how, this should take 13 hours; for a tota3 cost of 51,301. <br />The Mineral Joe 2 waste rock stockpile will need contouring. Using a D-8 dozer with an adjusted <br />production of 458 ley/hour for 3,100 Icy of material results in an estimated cost of S7C~Q. <br />Teak #4ype Reduction for Ej~walls at L~sdout Facilib and Porta_t <br />DMG estimated the cost to contour 1,390 Icy of material to be 5334. The cost for the slope <br />reduction highwalls at loadout titcility is covered under task #1. <br />T*sk #5 - Grade S acres to blend in with the Natural Terrain <br />DMG cost estimate is 52,162 to grade this 5 acres. Cotter agrees with this cost. <br />