Laserfiche WebLink
Stipulations <br />There aze no stipulations on this permit that have not been complied with. There have been no <br />stipulations issued on this permit since RN 04. <br />Variances <br />The Foidel Creek Mine permit does not include any variance under Rules 2.06.2, 2.06.3, and <br />2.06.5 [experimental practices, mountaintop removal, and approximate original contour (AOC) <br />for steep slope mining]. It does include a variance from contemporaneous reclamation for <br />combined surface and underground mining operations in that remnants of pits from a former <br />operation (CYCC Permit C-S1-071) have been incorporated into Permit C-1982-056 for portal <br />access to underground workings, and other surface facilities of the current underground <br />operations. <br />Bond <br />The current bond on this permit is in the amount of $ 6,333,973. The reclamation cost liability <br />was $6,259,593 (see Revisions above) as of this midterm review. There is sufficient bond for the <br />Division to accomplish reclamation, as presently estimated by progressive increases from the last <br />permit renewal, by a third party at the site. A history of bond activity since RN 04 is as follows. <br />Activity and Bond Amount <br />Date <br /> <br />Current Bond <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> National Union fire Insurance $5,889,046 <br />RN 04 <br />A compiled (of sequential, revision adjustments) reclamation cost estimate is being developed by <br />the Division as a part of this midterm review, and will be included herein when completed. <br />There have been no bond releases on this permit. <br />2005 Midterm Review, Permit C-1982-056, Foidel Creek Mine, Page 5 of 9 pages, November 17, 2005 <br />