Laserfiche WebLink
-7- <br />Stipulation No. 9: Define woody plant density re vegetation success standard. <br />Status: Resolved (January 23, 1986), <br />Stipulation No. 10: Define species diversity re vegetation success standard. <br />Status: Resolved (January 23, 1986). <br />Stipulation No. 11: Include annual re vegetation monitoring program. <br />Status: Resolved (January 23, 1986). <br />Stipulation No. 12: Maintain raptor buffer zones as established. <br />Status: Unresolved (future - commitment required). <br />Stipulation No. 13: Plan for enhancement or manipulation of mule deer <br />critica winter range habitat. <br />Status: Resolved (January 23, 1986). <br />Stipulation No. 14: Complete shear strength tests following representative <br />samp ing o coa processing waste pile, if different from assumptions then <br />submit revised stability analysis and pile design plan. <br />Status: Unresolved (future deadline). <br />Stipulation No. 15: Post rock-fall warning signs along haul road. <br />Status: Unresolved (future at time of road construction). <br />Stipulation No. 16: Include additional culverts or demonstrate adequacy of <br />esign prior to construction of haul road. <br />Status: Unresolved (future deadline). <br />Stipulation No. 17: Submit performance bond for expanded operation as defined <br />prior to any isturbance. <br />Status: Unresolved (future deadline)., <br />Summary of Stipulation Status <br />Resolved: 2, 8, 9, 10, 11, 13 <br />Unresolved (with future deadline): 1, 5, 6, 7, 12, 14, 15, 16, 17 <br />Ongoing: 3, 4 <br />Unresolved (delinquent): None <br />