Laserfiche WebLink
-B- <br />BONDING <br />The Division has reviewed the bond for the Munger Canyon Mine and Loma loadout <br />in accordance with Rule 3.02.2(4). The bond was recalculated as part of <br />Permit Revision No. 1 for the expanded operations including central facilities <br />area, coal processing waste disposal area and interconnecting road and <br />conveyor system. The additional bond amount, as defined in Stipulation No. 17 <br />of the findings and decision document, is required to be submitted 60 days <br />prior to any disturbance associated with the approved revision to the permit. <br />At present, no adjustment is required in the performance bond which is being <br />maintained by Salt Creek Mining Company for the Munger Canyon Mine. <br />/ljc <br />9010E <br />