My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36754
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:10 PM
Creation date
11/23/2007 8:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
General Documents
Doc Date
4/8/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />Minor Revision No. 2 <br />Construction of powerline to the mine (June 13, 1983). <br />The revision was approved (July 6, 1983) after information on obtaining BLM <br />right-of-way and reclamation costs for the 0.01 acres of additional <br />disturbance was provided. <br />Minor Revision No. 3: Reduction of water quality monitoring program <br />Marc <br />The revision was approved (March 20, 1984) to reduce monitoring to the below <br />mine surface water (SW-3) and ground water (GW-6) stations for major cations, <br />major anions, iron and field parameters. <br />Minor Revision No. 4: Relocate a topsoil stockpile to include haul road cut <br />sloug age materia March 22, 1984). <br />The revision was approved (May 7, 1984) and the Division determined the soil <br />suitable for revegetation from soil analyses submitted. <br />Minor Revision No. 5: Construction of a bridge to replace the culvert at the <br />au roa crossing of East Salt Creek (June 4, 19841. <br />The revision was approved (June 20, 1984). <br />Permit Revision No. 1: Addition of a central facilities area, coal processing <br />waste disposa area and an interconnecting road and conveyor system <br />(July 2, 1984). <br />The revision was approved (September 24, 1984), with stipulations. An <br />increase in disturbed area from 35 to 122 acres (87 ac) required an increase <br />in bond amount of $691,804. A discussion of stipulations attached to the <br />permit revision is presented in a separate section of this report. <br />Technical Revision No. 2: Construction of an access road for exploration <br />activities ea rng rom the mine bench to an existing road (June 24, 1985). <br />The revision was approved (July 23, 1985) with the condition that the operator <br />adhere to BLM surface owner requirements. <br />Technical Revision No. 4: Boundary change at the Loma loadout to revert to <br />original permitted configuration (October 7, 1985). <br />The revision was approved (October 28, 1985) to reduce the permitted area by 7 <br />acres with no change in bond amount. <br />Technical Revision No. 5: Response to stipulations (January 23, 1986). <br />The revision was approved (April 4, 1986). <br />
The URL can be used to link to this page
Your browser does not support the video tag.