My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36693
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:08 PM
Creation date
11/23/2007 8:50:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
7/28/1992
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />• <br />Findings of the <br />Colorado Mined Land Reclamation Division <br />for <br />The Edna Strip Mine <br />lanation of Findings <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, and the approved state program, the Mined <br />Land Reclamation Division or the Board must make specific written findings <br />prior to issuance of a permit, permit renewal or permit revision. These <br />findings are based on information made available to the Division that <br />demonstrates that the applicant will be able to operate in compliance with the <br />Colorado Surface Coal Mining Reclamation Act and the Regulations promulgated <br />pursuant to the Act. <br />The findings in the following sections required by Rule 2.07.6(2) are listed <br />in accordance with that Rule. The findings and specific approvals required <br />pursuant to Rule 2.07.6(2)(m) are listed in accordance with Rule 4 and are <br />organized under subject or discipline subtitles. <br />This findings document is updated upon permit renewal, which occurs every five <br />years for most mines. This is the renewal findings document for the Edna <br />Strip Mine, which has a five-year permit term. The following findings were <br />reevaluated and updated if necessary to reflect changes which have occurred <br />during the past permit term. Any stipulations from the original permit and <br />findings document or subsequent revisions that have been totally resolved to <br />the satisfaction of the Division, have been removed from this document. <br />SECTION A <br />Findings Required by Rule 2.07.6(2). <br />The permit application is accurate and complete. All requirements of <br />the Act and these rules have been complied with (2.07.6(2)(a)). <br />2. Based on information contained in the permit application and other <br />information available to the Division, the Division finds that surface <br />coal mining and reclamation can be feasibly accomplished at the Edna <br />Strip Mine (2.07.6(2)(b)). <br />3. The assessment of the probable cumulative impacts of all anticipated <br />coal mining in the general area on the hydrologic balance, as described <br />in 2.05.6(3>, has been made by the Division. This assessment entitled <br />"Yampa River" is available for inspection at the offices of the <br />Division. The Division finds that the operations proposed under the <br />application have been designed to prevent damage to the hydrologic <br />balance outside the proposed permit area (2.07.6(2)(c)>. <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.