Laserfiche WebLink
8 August 1984 <br />Page 2 <br />near the fire zone seems to be sufficient to cover all the pits and the tipple <br />area to a depth Af four inches .after grading. <br />Please refer to the enclosed timetable for the proposed reclamation dates. <br />EROSION CONTROL AND SEDIMENTATION PONDS ---- <br />GEC Minerals recognizes the necessity of maintaining the viability of the sed- <br />imentation ponds and the drainage patterns of these areas and will keep these <br />ponds and patterns effective throughout all phases of the reclamation work. <br />All ponds will be maintained to the standards required by the MLRD. <br />APPROXIMATE TIMETABLE FOR BEGINNING AND COMPLETION OF RECLAMATION PHASES --- <br />PHASE 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 <br />WEST PIT <br />Backfill --------- <br />Finish grade -------- <br />OVERBURDEN STOCKPILE # 2 <br />West pit -------- <br />East pit ---------------------------- <br />Finish grade ------ <br />OVERBURDEN STOCKPILE # 1 <br />LoM~ering ------------------------------ <br />Reducing sides ---------------- <br />Finish grade - - -- -------- <br />EAST PIT PLAN 3 <br />Backfill ------------------------------------------------------ <br />Finish grade -- -- --- ----- --- ----- <br />TOPSOIL STOCKPILE # 1 <br />West pit ------- <br />TOPSOIL STOCKPILE # 2 <br />East pit -- -- ---- --- <br />East pit finish grade ---- ----- -------- <br />ORPHAN PITS, REFUSE PIT AND TIPPLE AREA <br />Backfill -- --- ---- <br />Finish grade --- --- <br />