Laserfiche WebLink
Dowe Flats Reclamation Monitoring Protocol <br />LREP, Inc., Draft July 30, 2004 <br />A. Reclamation Planning Contractor meets with Boulder County staff to review the <br />reclamation plan for the coming year, in advance of the reclamation season <br />beginning in Mazch. <br />B. Evaluate results from previous year. <br />• Reclamation Planning Contractor late spring field inspection. <br />A. First evaluation of spring reclamation efforts, typically conducted second half of <br />May. <br />• Reclamation Planning Contractor summer field inspection. <br />A. Second evaluation of spring reclamation efforts, typically conducted in July. <br />B. Evaluate weed control activities. <br />• Summer field meeting with Reclamation Planning Contractor and Boulder County staff. <br />A. Mid-season evaluation of reclamation efforts and weed control. <br />• Reclamation Planning Contractor late summer/eazly fall field inspection. <br />A. Third evaluation of spring reclamation efforts, typically conducted in late August. <br />B. Evaluate weed control activities. <br />C. Prepaze for fall reclamation activities. <br />• Optional field inspections by the Reclamation Planning Contractor during seeding by the <br />Reclamation Field Contractor. <br />A draft reclamation inspection form is attached. <br />II <br />II <br />II <br />II <br />II <br />II <br />