My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-03_GENERAL DOCUMENTS - C1981022
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2003-10-03_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 7:44:29 AM
Creation date
11/23/2007 8:36:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
10/3/2003
Doc Name
Proposed Decision & Findings of Compliance for RN4
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 23 required submittal of maps that included the new permit boundary requested <br />in Permit Revision No. 3. This was complied with on January 27, 1997. <br />Stipulation No. 24 required submittal of construction, reclamation and bonding details for <br />methane degas wells. The stipulation was complied with on August 7, 1997. <br />Stipulation No. 25 required Oxbow Mining to submit a complete, updated topsoil balance for the <br />mine. It was complied with on May 14, 2003. <br />Stipulation No. 26 required that Oxbow Mining submit a mitigation plan for the ephemeral <br />drainage to the US Army Corps of Engineers for construction of the West Valley Fill refuse pile. <br />The stipulation was complied with on August 25, 1997. <br />Stipulation No. 27 required verification of the coefficient of permeability for the bottom of <br />Sediment Pond C prior to installation. The stipulation was complied with on September 5, 1997. <br />Stipulation No. 28 required submittal of a report predicting subsidence effects before the use of <br />the longwall method in the Sanborn Creek Mine. The stipulation was complied with on January <br />9, 1998. <br />Stipulation No. 29 required submittal of figures in the permit document reflecting the location of <br />the West Valley Fill diversion ditch. The stipulation was complied with on September 5, 1997. <br />Stipulation No. 30 required submittal of revised permit pages, figures and maps for the addition <br />of a new small azea exemption (SAE) to the permit azea. This stipulation was complied with on <br />May 28, 1998. <br />Stipulation No. 31 required an update of the Probable Hydrologic Consequences section of the <br />permit to address the anticipated impacts of mine water discharge from the amended CDPS <br />discharge point 011 within 30 days of approval of Minor Revision No. 51. This stipulation was <br />complied with on June 18, 1999. <br />Stipulation No. 32 required submittal of an as-built certification for the mine de-watering pond. <br />This stipulation was complied with on May 11, 1999. <br />Stipulation No. 33 required that discharges from amended CDPS dischazge point 011 be in <br />compliance with conditions and limitations of the mine's dischazge permit at any time discharge <br />occurred. The stipulation was complied with on January 14, 2002. <br />Stipulation No. 34 required as-built diagrams and certifications for all the sediment ponds <br />including revised pond cross-sections. This stipulation was satisfied by Minor Revision 68, and <br />was complied with on June 10, 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.