Laserfiche WebLink
-6- <br />These extra costs should be calculated and submitted for <br />review by the Division. They were improperly excluded from <br />the original cost estimates. <br />Does the current reclamation bond include 568,295 for <br />reclamation of the Hubbard Creek for Station No. 2? The <br />reclamation cost summaries contained in Appendix E need to <br />be updated to reflect current bond liability. <br />srs <br />9077E <br />