My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-01-22_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2002-01-22_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 7:27:36 AM
Creation date
11/23/2007 8:34:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
1/22/2002
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR4
From
Add Acreage for Development Mining
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Division of Minerals and Geology proposes to approve an application for revision <br />of a valid, existing permit. There are four stipulations that have been carried over from previous <br />permitting actions that aze still active. <br />Stipulation No. 14 <br />Somerset Mining Company must submit a mine plan change to, and receive approval from, <br />all applicable state and federal agencies before pulling pillars from the B seam underneath <br />any unmined C seam areas with less than 1,500 feet of cover within Federal Coal Lease <br />COC-53510. <br />Stipulation No. 16 <br />The operator will, pursuant to Rule 4.10.2(2)(b), submit to the Division as part of the <br />quarterly coal mine waste pile inspection report, compaction test results for that pile. <br />Testing will t~tlce place on an as-needed basis, depending on the rate at which the pile <br />receives coal mine waste, to ensure stability of the pile. <br />Stpulation No. 25 <br />Upon completion of construction, Oxbow shall submit a final volume for the total salvaged <br />topsoil and amount of topsoil available for future reclamation at each of the following: <br />West Valley fill haul road; west valley fill; elk creek facilities and stockpile area expansion; <br />pond C. <br />[Note: Stipulation Nos. 1 through 13, 15, 17, 18, 19, 21 through 24, and 26 through 32 have all <br />been previously complied with. No. 33 was withdrawn because it dealt with a temporary situation <br />- a temporary water discharge -which has since been curtailed.] <br />This approval involves one additional stipulation, Stipulation No. 34, as follows <br />Stipulation No. 34 <br />Approval of Permit Revision No. 4 is conditioned upon the submittal and Division <br />approval of the following: <br />As-built certifications for each of the existing sediment ponds. The as-built certifications <br />are to follow the format presented in OMLLC's response to question number 26 in <br />OMLLC's letter to the Division dated November 7, 200]. <br />2. Revised seditent pond cross-section and plan view drawings for Pond A1, Pond B, the <br />Upper Hubbard Gulch Pond and the Sanborn Creek Mine Dewatering Pond [hat depict <br />
The URL can be used to link to this page
Your browser does not support the video tag.