My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35990
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:44 PM
Creation date
11/23/2007 8:34:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/5/1997
Doc Name
MEMO TRAPPER MINE PERMIT C-81-010 VEGETATION COVER STANDARDS
From
DMG
To
DAVID BERRY LARRY ROUTTEN
Permit Index Doc Type
VEGETATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />David Berry and Lacry Routten <br />December 5, 1997 <br />Chronology of how Trapper's cover standard was developed <br />Page 2 <br />Date Event <br /> CMLRD and OSM approve Trapper's new permit C-81-O10 with the <br /> stipulation that within 6 months of permit issuance Trapper and the Division <br />12/82 will devise acceptable criteria for the evaluation of revegetation success for <br /> herbaceous cover (and productivity), to be applied to all areas to be reclaimed <br /> during the S-year permit term. OSM's memo that recommends approval of the <br /> permit explicitly refers to this stipulation. <br />5/23/82 Trapper submits for CMLRD's approval two possible methods of evaluating <br /> cover. <br />11/25/85 Memo from M. Savage to G. Squire summarizes review of Trapper's submittal <br /> and identifies changes in statistical analysis necessary for approval. <br /> Letter from M. Long to Trapper explains that further pit advancement cannot <br />2/18/87 be approved until reveg. success standards are finalized. (Development of <br /> shrub density standard was in progress.) <br /> Preliminary adequacy review letter for RN-O1/PR-02 from G. Squire to <br />4/14/87 Trapper explains that renewal cannot be approved until Trapper submits <br /> acceptable standards for shrub density, productivity, and vegetative cover. <br /> Memo from M. Savage to G. Squire/M. Long explains that the method <br />4/14/87 proposed by Trapper in PR-02 which measures success of cover and <br /> production by comparing reclaimed areas to reference areas is acceptable . <br />5/28/87 Letter from Trapper (B. Humphries) proposes cover standard that is a back- <br /> calculation of the minimum cover needed according to the USLE. <br />6/9/87 Letter from G. Squire to Trapper says method proposed in 5/28/87 letter is <br /> acceptable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.