My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35945
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35945
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:42 PM
Creation date
11/23/2007 8:32:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
9/16/1997
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision <br />The Colorado Division of Minerals and Geology proposes to approve with stipulations an <br />application from the Pittsburg and Midway Coal Mining Company (P&M) for a permit renewal at <br />the Edna Mine. This decision is based on a finding that the operations will comply with all <br />requirements of the Colorado State Program as found in the Colorado Surface Coal Mining <br />Reclamation Act, C.R.S. 34-33-101 et seq., and the Regulations promulgated pursuant to the Act. <br />If no request for a formal hearing is made within thirty (30) days of the first publication of the <br />issuance of this proposed decision, then this decision becomes final. The permit application, all <br />supporting documentation and any stipulations or conditions will become a binding part of the <br />permit. <br />The following stipulation is in effect for the Edna Mine. <br />Water from NPDESpoint 007 will not be used as surface irrigation water unless the operator first <br />demonstrates and the Division finds that irrigation with that water will not result in material <br />damage. <br />The Division last made detailed findings of compliance for the Edna Mine with Permit Revision No. <br />3, approved on May 16, 1994. At that time, the Division imposed three stipulations on its approval <br />of the revision. Stipulation 31, which defined a deadline for completion of the West Ridge <br />Hydrologic Reconstruction Plan was terminated on October 31, 1995. Stipulation No. 34, <br />terminated on December 31, 1994, required that P&M sample water in permanent ponds to <br />determine whether it metthestandazdsforitsintendeduse. StipulationNo.35,whichrequiredP&M <br />to obtain storage rights for permanent pool volumes in the Center Ridge and West Ridge ponds, was <br />complied with on December 31, 1994. <br />There are no other stipulations pending. <br />Edna Mine ? Permit Renewal No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.