My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35773
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:36 PM
Creation date
11/23/2007 8:26:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
9/19/1984
Doc Name
Final Draft Proposed Decision & Findings of Compliance
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />Stipulation No. 7: <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION A PLAN FOR PERIODICALLY MONITORING THE SUCCESS OF <br />REVEGETATION. ALL REVEGETATED AREAS SHOULD BE REPRESENTATIVELY <br />SAMPLED AT LEAST ONCE DURING THE FIRST FIVE GROWING SEASONS, AND <br />PERIODICALLY THEREAFTER UNTIL BOND IS RELEASED. <br />Stipulation No. 8: <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION ACCEPTABLE PLANS, INCLUDING APPROPRIATE CROSS SECTIONS, FOR <br />RECLAIMING THE SEDIMENT PONDS AT PITS 2, 3 AND 4.. <br />THE PLANS MUST DEMONSTRATE COMPLIANCE WITH RULE 4.14.1(2)(a) WHICH <br />SPECIFIES THAT SPOIL BE "GRADED TO ELIMINATE ALL HIGHWALLS, SPOIL <br />PILES AND DEPRESSIONS." <br />Stipulation No. 9: <br />WITHIN SIX MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A <br />PLAN FOR CONTROLLING RILL AND GULLY EROSION DURING THE EARLY STAGES <br />OF RECLAMATION. THE PLAN WILL ADDRESS BOTH PREVENTATIVE AND REMEDIAL <br />MEASURES. <br />Stipulation No. 10: <br />WITHIN 30 DAYS OF PUBLICATION OF THE PROPOSED DECISION, THE <br />APPLICATION TEXT MUST BE UPDATED TO REFLECT ACTUAL CONDITIONS AT THE <br />MINE, AS DEPICTED ON THE MINING PLAN MAP SUBMITTED MAY 4, 1984. <br />Stipulation No. 11: <br />A. WITHIN SIX MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO <br />THE DIVISION ALIGNMENT, PLAN VIEW AND CROSS-SECTION INFORMATION, AND <br />DRAINAGE SPECIFICATIONS FOR THE MAIN HAUL/ACCESS ROAD. FOR PORTIONS <br />OF THE ROADWAY WHICH EXCEED THE CUT SLOPE AND EMBANKMENT SLOPE GRADE <br />RESTRICTIONS OF THE REGULATIONS, THE OPERATOR WILL PREPARE AND SUBMIT <br />APPROPRIATE STABILITY ANALYSES. "WORST CASE" ANALYSES MAY BE <br />SUBMITTED IF GEOTECHNICAL ANALYSES DEMONSTRATE THAT THE CUT SLOPE AND <br />EMBANKMENT SLOPE SITUATIONS PURPORTED TO BE REPRESENTED BY THESE <br />ANALYSES ARE ANALOGOUS. <br />B. IF THE DIVISION DETERMINES THE ROAD TO BE UNSUITABLE FOR THE <br />POST-MINING LAND USE, A PLAN FOR DECOMMISSIONING THE ROAD WILL BE <br />SUBMITTED WITHIN ONE YEAR OF PERMIT ISSUANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.