Laserfiche WebLink
-3- <br />FLOW IS TO BE VISUALLY CHECKED AT EACH SITE NOTING NO FLOW, LOW, <br />MODERATE, OR HIGH FLOW. MONTHLY FLOW READINGS ARE TO BE CONTINUED AT <br />SW4. <br />2. THE PERMITTEE WILL SAMPLE SITES SWl through 10 TWICE YEARLY, ONCE <br />DURING SPRING MELT AND ONCE DURING A STORM EVENT. SITES WILL HAVE <br />FIELD PARAMETERS TESTED WITH FLOW DESCRIBED. CHEMICAL ANALYSES WILL <br />BE SUBMITTED FOR EACH SITE WITH FLOW. THE PERMITTEE WILL SUBMIT ALL <br />SURFACE WATER DATA ANNUALLY TO THE DIVISION. <br />3. THE ALLUVIAL WELLS MWl-3, WILL CONTINUE TO BE MONITORED MONTHLY <br />FOR WATER LEVEL, pH, EC, AND TEMPERATURE. THE FULL CHEMICAL SUITE AS <br />PREVIOUSLY SUBMITTED WILL BE ANALYZED SEMI-ANNUALLY; ONCE DURING <br />SNOWMELT AND ONCE DURING A RAINFALL EVENT. <br />THIS INFORMATION WILL BE COMPILED BY THE PERMITTEE AND SUBMITTED TO <br />THE DIVISION ON AN ANNUAL BASIS. <br />Stipulation No. 4: <br />THE PERMITTEE WILL PLACE GROUND WATER MONITORING WELLS IN RECLAIMED <br />PITS 2 AND 5. THESE WELLS WILL BE COMPLETED DOWN TO BEDROCK AND <br />LOCATED ON THE RESPECTIVE DOWNDIP SIDES OF THE PITS. THE PERMITTEE <br />WILL HAVE THE LOCATIONS OF ALL WELLS APPROVED BY THE DIVISION BEFORE <br />DRILLING AND IMPLACEMENT OF MONITORING EQUIPMENT. ACCEPTABLE PLANS <br />tdUST BE SUBMITTED WITHIN 1 MONTH OF PERMIT ISSUANCE AND THE WELLS <br />MUST BE INSTALLED DURING THE 1984 CONSTRUCTION SEASON. WELL <br />COMPLETION DIAGRAMS WILL BE SUBMITTED TO THE DIVISION WITHIN ONE <br />MONTH OF COMPLETION. THESE WELLS WILL BE TESTED QUARTERLY FOR FIELD <br />PARAMETERS AND CHEMICAL PARAMETERS. THE RESULTS WILL BE SUBMITTED TO <br />THE DIVISION ON AN ANNUAL BASIS. <br />THE MONITORING WELL FOR PIT 4 WILL HAVE A LOCATION APPROVED BY THE <br />DIVISION, AND WILL BE INSTALLED WITHIN THE FIRST CONSTRUCTION SEASON <br />FOLLOWING FINAL REGRADING. <br />Stipulation No. 5: <br />WITHIN 1 MONTH OF PUBLICATION OF THE PROPOSED DECISION, THE PERMITTEE <br />WILL SUBMIT 3 COPIES OF THE FINAL APPROVED AIR EMISSION PERMIT FOR <br />INCLUSION IN THE APPLICATION. <br />Stipulation No. 6: <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT RESULTS <br />OF THE C.S.U. FERTILITY ANALYSES AND A PROPOSED FERTILIZATION PLAN <br />(RATE AND TIMING OF APPLICATION). <br />