Laserfiche WebLink
-13- <br />Stipulation No. l: <br />THE PERMITTEE WILL INSTALL A STAFF GAUGE AT SEDIMENT POND 4 TO <br />INDICATE SEDIMENT LEVEL. THE POND SEDIMENT LEVEL WILL BE MAINTAINED <br />AT LESS THAN 1.75 ACRE FEET OF SEDIMENT. THE STAFF GUAGE WILL BE <br />INSTALLED WITHIN ONE MONTH OF ISSUANCE OF THE PROPOSED DECISION. <br />Sediment Pond 6 <br />The applicant proposes to leave Sediment Pond 6 as a permanent stockpond. The <br />following stipulation is required: <br />Stipulation No. 2: <br />THE PERMITTEE WILL REGISTER THE PIT 5/6 SEDIMENT POND WITH THE <br />COLORADO DEPARTMENT OF WATER RESOURCES. THE FORM REQUIRED IS FOR <br />LIVESTOCK WATER TANK - AS BUILT STRUCTURE. THE POND MUST BE <br />REGISTERED PRIOR TO FINAL BOND RELEASE. <br />Diversion and Collection Ditches <br />Potential erosive velocities have <br />at the Grassy Gap Mine. Erosion <br />problem. Enlargement and/or rock <br />ditch segments where steep slopes <br />protection is being handled as a <br />stipulation. <br />been calculated for certain ditch segments <br />in the ditches has recently been noted as a <br />riprap lining is being required in those <br />have resulted in downcutting. The channel <br />violation abatement rather than a permit <br />Surface Water Monitoring <br />The surface water monitoring program presently consists of monthly field <br />parameters checked at 10 surface water stations in the mine area. The <br />operator has proposed to modify this program to include only SWl and SW4 and <br />exclude all ephemeral and intermittent sampling sites. This proposal is not <br />acceptable due to the fact that the program would not adequately detect the <br />impacts of mining on surface water. Therefore, the following stipulation is <br />needed. <br />Stipulation No. 3: <br />1. THE PERMITTEE WILL TEST THE FOLLOWING SURFACE WATER SITES MONTHLY <br />FOR FIELD PARAMETERS OF TEMPERATURE, pH, CONDUCTIVITY, AND DISSOLVED <br />OXYGEN. <br />SW1 SW4 <br />SW2 SW7 <br />SW3 SW8 <br />FLOW IS TO BE VISUALLY CHECKED AT EACH SITE NOTING NO FLOW, LOW, <br />MODERATE, OR HIGH FLOW. MONTHLY FLOW READINGS ARE TO BE CONTINUED AT <br />SW4. <br />