My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35749
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:35 PM
Creation date
11/23/2007 8:26:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
10/8/2004
Doc Name
Construction Quality Assurance
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc Summary No. 21 Page 2 043-2170 <br />Field Monitorine and Testine Activities <br />Golder observed construction activities associated with Phase PJc earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder visually observed the placement of DCF in the Phase IVc OSA azea. Golder CQA monitors <br />(one monitor per dozer when dozers are greater than 50 feet apart) observed DCF placement and <br />verified minirnum thickness of 2 feet for finish grade, and 4 feet for haul traffic (i.e., Caterpillar <br />Mode1740 articulated trucks). <br />Golder observed placement of HVSC piping in the Phase IVc OSA, verifying installation and layout <br />per the project plans. <br />Laboratory Tests <br />Golder completed QA and QC testing for the remainder of the Phase PJc OSA construction. <br />Meetines <br />CC&V held a Weekly Contractors' meeting on September 28, 2004. Items discussed included <br />Safety, Env~ronrnental, Schedule, QC documentation, and CQA. No more weekly meetings will be <br />held during the Phase IVc OSA construction. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />fly =~~ (~~~ -~o-`~ <br />Ron DiDonato <br />Project Resident <br />rn~.o ~vo z,s~mx~zc-oaox{os zoos Golder Associates lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.