Laserfiche WebLink
ASSO ~eS <br />October 6, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RE: Summary No, 21: September 26 through October 06, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Deaz Mr. Roberts: <br />OCT 0 8 20pg <br />Qi~ision of Minerals and Geology <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of September 26 <br />through October 6, 2004. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime Iow <br />temperatures ranged from 32° F to 41° F, and highs ranged from 38° F to 65° F. Weather <br />observations were made on eleven days of this seven-day reporting period. <br />Construction Synonsis <br />Ames Constrction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction acri~ri±ies on eight days of ±his eleven-day <br />reporting period (September 27 through October 6, 2004). <br />Phase Nc <br />Ames continued hauling, placement and grading of DCF material into the Phase fVc OSA in the eastern <br />section of the VLF, Raven Hill area. Ames placed DCF material and High Volume Solution Collection <br />(HVSC) piping per the project plans onto approved geomembrane panels. <br />A map ofthe area worked during this reporting period is provided in Attachment B. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Projec4 i'6e~ <br />Phase Nc 21 September 26-October 06, 2004 043-2170 <br />