Laserfiche WebLink
• -2 <br />Stipulation No. 32 <br />THE OPERATOR SHALL MONITOR ONE ALLUVIAL WELL IDENTIFIED AS NODE 22 OR <br />B7, MATER LEVELS. pH, ELECTROCONDUCTIVITY AND TEMPERATURE IN THIS WELL <br />MUST BE MONITORED MONTHLY, AS WEATHER PERMITS. AND WATER QUALITY SAMPLES <br />SHALL BE DRAWN QUARTERLY FOR THE PARAMETERS LISTED IN APPENDIX A. <br />Stipulation No, 28 <br />CWI SHALL COMPLETE THE ON-THE-GROUND FIELD VERIFICATIONS OF SURFACE <br />WATER RESOURCES ON THOSE LANDS FOR WHICH RIGHT OF ENTRY HAS NOT BEEN <br />OBTAINED. THE RESULTS OF THE SURVEY SHALL BE APPROVED BY THE DIVISION <br />PRIOR TO CWI UNDERMINING OR OTHERMISE AFFECTING THESE LANDS. <br />Stipulation No. 30 <br />CWI SHALL CONTINUE TO MAINTAIN RAINGAGE AND EVAPORATION PAN MONITORING <br />AT OR NEAR THE CWI WELLFIELD, THE RAINGAGE SHALL RECORD DAILY AND THE <br />EVAPORATION MONITOR SHALL RECORD EVAPORATION MONTHLY WHEN NOT FROZEN. <br />Stipulation No, 31 <br />CWI SHALL SUBMIT A PLJW TO MONITOR HATER QUANTITY CHANGES AS A RESULT OF <br />• CHANGING THE OVERLAND DITCH POINT ff DIVERSION TO WEST ROAT CAP CREEK, <br />WITHIN THIRTY DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 26 <br />ONE YEAR AFTER THE COMPLETION OF RECLAMATION ACTIVITIES AT THE LOADOUT, <br />THE OPERATOR SHALL CIIMPARE THE SOIL CHARACTERISTICS OF THE RECLAIMED <br />AREA WITH THE ADJACENT UNDISTURBED ORCHARD AREAS TO VERIFY THAT THE <br />HYDROLOGIC FUNCTION OF FLOOD IRRIGABILITY HAS BEEN RESTORED. SUCH <br />COMPARISON SHOULD BE IN THE FORM OF INFILTRATION, PERMEABILITY AND <br />TEXTURE STUDIES. <br />Stipulation No. 33 <br />VENTILATION SHAFT CONSTRUCTION ACTIVITIES MILL BE PERFORMED PRIOR TO <br />JUNE 1, 1988. OR FOLLOWING JUNE 15, 1988 TO REDUCE DISRUPTION DURING THE <br />FANNING PERIOD. <br />STIPULATION N0. 34 <br />MINIMIZATION OF WILDLIFE DISTURBANCE ON THE LIGHT USE ROAD WHICH RUNS <br />BETWEEN OVWM AND THC VENTILATION SHAFT/WATER STORAGE TANK BENCH WILL BE <br />ACCOMPLISHED BY: <br />A) CLOSING ROAD TO PUBLIC USE; <br />B) LIMITING TRAY EL FOR ROUTINE MAINTENANCE ACTIVITIES TO BETWEEN <br />10 AM AND 2 PM DURING OELEMBER, JANUARY, MARCH AND APRIL WHEN <br />• BIG GAME ANIMALS ARE PRESENT. <br />