My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35604
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:31 PM
Creation date
11/23/2007 8:23:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
7/21/1988
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED DECISION <br />Colorado Westmoreland Inc. -Orchard Yalley Mine <br />The Colorado Mined Land Reclamation Division proposes to approve. with <br />stipulations, an application for renewal of a permit submitted by Colorado <br />Westmoreland Inc, for the Orchard Yalley Mine. <br />This decision 1s based on a finding that the proposed operation will comply <br />with the requirements of the Colorado Surface Coal Mining-Reclamation Act, <br />C.R.S. as amended, 343-101 et s~ce ., and the Regulations promulgated pursuant <br />to the Act. <br />The finding of compliance, and the stipulations which area part of this <br />approval, are attached to this document. <br />The permit renewal approval cannot be issued until all statutory notice and <br />public comment requirements have been satisfied. <br />• The permit application and the stipulations will become a binding part of the <br />permit upon approval. The stipulations for the Orchard Yalley Mine are as <br />follows: <br />Stipulation No. 26 <br />CNI SHALL SUBMIT RIGHT OF ENTRY INFORMATION TO MLRO FOR ALL SURFACE <br />AFFECTED LANDS WITHIN THE PERMIT AREA PRIOR TO EXTRACTING COAL BENEATH <br />THESE LANDS OR OTHERWISE AFFECTING THEIR. <br />Stipulation No. 29 <br />THE OPERATOR SHALL CONTINUE TO SUBMIT TO THE D N ISION AN ANNUAL REPORT <br />OF INFLOWS, 6ISCHARGES, AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND <br />QUANTITY OF INFLOWS; A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN <br />THE SOURCE (I.E., FAULT. FRACTURES, ETC.), QUANTITY, DURATION AND <br />QUALITY (I.E., pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL <br />MEASURABLE INFLOWS; A TABLE CONTAINING RECORDS OF WATER IMPORTED FOR USE <br />WITHIN THE MINE; A DISCUSSION OF THE MATER BALANCE WITHIN THE MINE; AND <br />FINALLY. A PROJECTION OF HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING <br />YEAR. THE MINE INFLOW STUDY SHALL BE CONDUCTED DURING THE MONTH OF <br />JUNE. IF THE OCCURRENCE OF INFLOWS BECOMES SIGNIFICANTLY GREATER THAN <br />THE ANTICIPATED RATES. THE DIVISION MAY REQUIRE THAT AN ADDITIONAL <br />INFLOW STUDY BE CONDUCTED AT ANOTHER TIME DURING THE YEAR. <br />C7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.