Laserfiche WebLink
mechanism or instrument utilized. A change in demonstration of fznancial <br />responsibility must be approved by the Director. A minor Permit modification <br />shall be made to reflect any change in financial mechanisms, without further <br />opportunity for public comment. <br />2. Insolvency olFinancial Institution. In the event shat an alternate demonstration <br />of financial responsibility has been approved under (b) above, the permittee must <br />submit an alternate demonstration of fznancial responsibility acceptable to the <br />Director within sixty (60) days after either of the following events occur: <br />(a) The institution issuing the trust or financial instrument files for bankruptcy; or <br />(b) The authority of the trustee institution to act as trustee, or the.authoriry of the <br />institution issuing the financial instrument, is suspended or revoked. <br />3. Cancellation of Demonstration b~Financiallnstitution. The permittee must <br />submit an alternative demonstration off:nancial responsibility acceptable to the <br />Director, within sixty (60) days after the institution issuing the trust or financial <br />instrument serves 120-day notice to the EPA of their intent to cancel the trust or <br />financial instrument. <br />PART III. GENERAL PERMIT CONDITIONS <br />A. EFFECT OF PERMIT <br />** <br />APPENDIX I (Groundwater and Surface Water Monitoring Plan) <br />~** <br />APPENDIX J (Subsidence Monitoring Plan) <br />*** <br />IS MODIFIED TO READ: <br />PART II. SPECIFIC PERMIT CONDITIONS <br />*** <br />A. WELL CONSTRUCTION REQUIREMENTS <br />*** <br />Drag Modification No. 9 UIC Area Permit No. C030858-00000 Page 6 of 44 <br />