Proposed lanQUa¢e: <br />Monitoring of water quality and water level shall occur according to the Water Monitoring Plan, <br />Appendix I. The permittee has already collected five (5) quarters of baseline data, prior to the <br />commencement of operations, for the Alluvial Aquifer, the Upper Aquifer (A-Groove and Uinta <br />Formation), and the Lower Aquifer (B-Groove and Dissolution Surface). Additional monitoring <br />wells may be deleted or added to the monitoring program, if necessary, as development of the <br />commercial solution mining well field progresses, or as warranted by monitoring results. This will <br />be done by modifying the Water Monitoring Plan (see Section D. 4~n paragraph of Permit). <br />• Part II, C (6), Injection Fluid Limitation, the last paragraph of the section is proposed to be <br />changed as follows: <br />Current language: <br />Injection of any hazazdous waste as identified by EPA under 40 CFR § 261.3 is prohibited. Upon <br />a major change in the fluid sources, the permittee must re-demonstrate compliance with 40 CFR § <br />262.11 (page 21 of the Water Monitoring Plan), Appendix I. <br />Proposed IaneuaHe: <br />Injection of any hazardous waste as identified by EPA under 40 CFR § 261.3 is prohibited. Upon <br />a major change in the fluid sources, the Permittee must re-demonstrate compliance with 40 CFR § <br />262.11. The Water Monitoring Plan (Appendix I) includes this requirement. <br />• Part II, D, Monitoring, 1st paragraph of the section is proposed to be changed as follows: <br />Current language: <br />The permittee is required to carry out the activities described in the monitoring plan. The data must be <br />reported and maintained as provided in Section II D.4 of the Permit. The 4th Revision of the Water <br />Monitoring Plan, dated December 23, 1999, has been incorporated into the Permit as Appendix I. <br />Proposed lan¢ua¢e: <br />The permittee is required to carry out the activities described in the monitoring plan. The data <br />must be reported and maintained as provided in Section II D.4 of the Permit. The Ground Water, <br />Surface Water, and Process Monitoring Plan (Water Monitoring Plan), dated September 2004, <br />has been incorporated into the Permit as Appendix I. <br />• Part II, D, Monitoring, 2nd paragraph of the section is proposed to be changed as follows: <br />Current language: <br />The Water Monitoring Plan includes ground-water monitoring, for the Piceance Site (solution well field <br />and upper plant) and the Parachute Site (lower plant, which is not covered by the Permit). It also <br />contains a process monitoring section, (found in Section 4.0 of the Water Monitoring Plan, Appendix I) <br />for mining operations at the Piceance Site. <br />Proposed language: <br />The Water Monitoring Plan includes ground-water monitoring, for the Piceance Site (solution <br />well field and upper plant) and process monitoring for mining operations at the Piceance Site. It <br />also contains monitoring provisions for surface ponds and the pipeline, which are not covered by <br />the Permit. <br />Draft Addendum to SOB For Modification No. 9, UIC Area Permit No. CO30858-00000 Page 14 of 17 <br />