Laserfiche WebLink
n ' <br />.~ i% <br />Dan Mathews <br />-2- December 30, 1981 <br />(5) The reclamation costing calculations must be armnded to correct <br />.apparent errors. My calculations determined t1~e following material <br />quantities and costs, using the applicant's costing figure of $1.15 per <br />cubic yard for material placement. <br /> 3 ACRE RECLAMATION COSTS* <br />ITEM: QUANTITY: COST: <br />Subsoil 19,520 yd3 $16,698.00 <br />Topsoil 4,840 yd3 5,566.00 <br />Manure 806.67 yd3 927.67 <br />TOTAL 3 ACRE COST: $23,191.67 <br />*(Based upon applicant's projected ma ximi~m disturbed area of 3 acres and <br />projected material placement cost of $1.15 (yd3)) <br />The applicant has incorrectly projected a maximum material placement cost <br />of $10,171.30. The error appears to have arisen within their quantity <br />calculations. <br />/mt <br />cc: Fred Banta <br />David Shelton <br />