Laserfiche WebLink
-30- <br />XI V. Prime Farmlano - Rules 2.04.12, 2.06.6 and 4.25 <br />Based on information provided by the applicant on page 2.04.12 and Division <br />contact with the U.S.D.A. Soil Conservation Service, the Division finds that <br />there are no prime farmland soils within the permit area. <br />The Division finds the operation in compliance with Rules 2.07.6(2)(k) with <br />regard to prime farmlands. <br />The operation is in compliance with the requirements of this section. <br />XV. Operations Description - Rules 2.05.2, 2.05.3(1), 2.05.3(2) and 4.01 <br />The Division has reviewed the information provided by the applicant in Section <br />D of the permit application. <br />Walden Coal Company plans to mine coal at a rate of approximately 100,000 tons <br />per year during this permit term. Total disturbance will encompass 109.6 <br />acres. The life-of-mine is anticipated to be five years. <br />Two coal seams will be mined by truck and shovel mining operations at the <br />site. The upper seam (Hoyle) overlies the lower seam (Sudduth) at the <br />northwestern portion of the penmit area, but is absent elsewhere. The mine <br />plan allows for the recovery of the Hoyle seam, with the subsequent recovery <br />of the lower Sudduth seam. <br />The seams dip toward the northwest with the Hoyle seam averaging 16 feet in <br />thickness and the Sudduth seam averaying 25 feet in thickness. Approximately <br />80 feet of interburden separate the seams. <br />The operation is found to be in compliance with the requirements of this <br />section. <br />XVI. Explosives - Rules 2.05.3(6) and 4.08 <br />The Division has reviewed the information submitted by the applicant on page <br />D-3 of the permit application. <br />The applicant has not used explosives during the operation of the mine to this <br />point. The applicant states that if blasting becomes necessary in the future, <br />a detailed blasting plan will be submitted to the Division for approval at <br />least 60 days prior to the proposed initiation of blasting. <br />The applicant is in compliance with the requirements of this section. <br />