Laserfiche WebLink
~. <br />-4- <br />STIPULATION N0. 6 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE APPLICANT'S SEED MIX WILL BE <br />REVISED TO LIST ADAPTED SPECIES OF BLUEGRASS, BUCKWHEAT AND LUPINE, OR <br />ACCEPTABLE SUBSTITUTES. <br />STIPULATION N0. 7. <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />INFORMATION TO THE DIVISION VERIFYING THE EXISTING POWER LINES ARE <br />CONSTRUCTED AS REQUIRED BY RULE 4.18 TO INSURE THE PROTECTION OF LARGE <br />RAPTORS. <br />STIPULATION N0. 8 <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL PREPARE AND <br />SUBMIT TO THE DIVISION FOR APPROVAL AN APPROPRIATE ANALYTICAL <br />DEMONSTRATION OF THE PROPOSED TOPOGRAPHY'S SLOPE STABILITY. "WORST <br />CASE" SITUATIONS FROM CROSS SECTIONS IN THE APPLICATION WOULD BE <br />ACCEPTABLE. THE REPORT PREPARED BY LAMBERT & ASSOCIATES INCLUDED IN <br />THE APPLICATION SHOULD PROVIDE THE NECESSARY MATERIAL STRENGTH <br />PARAMETERS. <br />STIPULATION N0. 9 <br />WITHIN THREE MONTHS OF PERMIT ISSUANCE, AND PRIOR TO INITIATION OF <br />CONSTRUCTION OF THE PROPOSED WASTE PILE, THE PERMITTEE WILL AMEND THE <br />WASTE PILE CONSTRUCTION PLAN SO AS TO ELIMINATE DISCHARGE OR COLLECTION <br />PIPES AS COMPONENTS OF THE SUBDRAIN SYSTEM. <br />STIPULATION N0. 10 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE WILL SUBMIT A PLAN <br />FOR STORAGE AND DISPOSAL OF NON-COAL WASTE IN COMPLIANCE WITH RULES <br />2.05.4(2)(f) and 4.11.4 <br />Stipulation No. 11 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE APPLICANT WILL COMMIT TO <br />IMPLEMENTATION OF THE SUBSIDENCE MONITORING PLAN AS RECOMMENDED BY THE <br />CONSULTANT'S REPORT CONTAINED WITHIN THE APPLICATION. <br />STIPULATION N0. 12 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION, WITHIN 120 DAYS OF PERMIT <br />ISSUANCE, A PLAN FOR SEALING PORTALS IN ACCORDANCE WITH 30 CFR 75.1711. <br />STIPULATION N0. 13 <br />PRIOR TO PERMIT ISSUANCE, THE OPERATOR MUST SUBMIT TO THE DIVISION <br />PROOF-OF-PAYMENT OF THE RECLAMATION FEES DUE. <br />