My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35449
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:25 PM
Creation date
11/23/2007 8:20:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
12/14/1984
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;. <br />-3- <br />2. PUMPAGE RATES FROM 7HE MINE TO THE SEDIMENT PONDS WILL BE RECORDED <br />WITH THE MINE WATER TESTED QUARTERLY FOR FIELD PARAMETERS AND ONCE <br />EARLY FOR THE FULL SUITE OF CHEMICAL PARAMETERS. <br />3 )VI THE MINE WELLS <br />' 0.5 AND 1.5 COMPLETED IN THE COAL SEAMS OVERLYING <br />l <br />)I HE E SEAM WILL BE SAMPLED ON A QUARTERLY BASIS FOR WATER LEVEL AND <br />~yb~~~ <br />~, M ELD PARAMETERS. <br />r <br />~.Oy~>~"~ "~ I. A WELL WILL BE PLACED AT THE PROJECTED BASE OF THE REFUSE PILE AND <br />~ <br />~~IC~C COMPLETED IN THE <br />DISTURBANCE AT THE ALLUVIUM. THIS WELL MUST BE COMPLETED <br />REFUSE WASTE SITE. COMPLETION DIAGRAMS PRIOR TO <br />SHOULD BE <br /> SUBMITTED TO THE DI VISION WITHIN 30 DAYS OF COMPLETION. THIS WELL WILL <br /> BE SAMPLED MONTHLY FOR WATER LEVEL AND FIELD PARAMETERS AND QUARTERLY <br /> FOR FULL SUITE CHEM ICAL PARAMETERS. <br />FIELD PARAMETERS <br />FULL SUITE CHEMICAL PARAMETER <br />TEMPERATURE pH MAGNESIUM <br />pH TEMPERATURE SULFATE <br />CONDUCTIVITY SPECIFIC CONDUCTANCE FLUORIDE <br />FLOW OR WATER LEVEL DISSOLVED SOLIDS BORON <br /> SODIUM ALKALINITY <br /> POTASSIUM BICARBONATE <br /> CALCIUM <br />STIPULATION N0. 2 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION A DESIGN TO PROVIDE FOR <br />NON-CLOGGING FREE OPERATION OF THE ORIFICE IN POND SP-2 WITHIN 30 DAYS <br />OF PERMIT ISSUANCE. <br />STIPULATION N0. 3 <br />THE PERMITTEE WILL PRESENT TO THE DIVISION A PLAN WHEREBY THE 60 <br />PERCENT SEDIMENT VOLUME LEVEL CAN BE MARKED ON PONDS SP-1 AND SP-2. <br />THIS PLAN SHOULD BE SUBMITTED WITHIN 60 DAYS OF PERMIT ISSUANCE. THE <br />PONDS WILL BE MAINTAINED WITH SEDIMENT LEVEL AT OR BELOW THIS LEVEL. <br />STIPULATIUN N0. 4 <br />THE PERMITTEE MUST IDENTIFY THE AMOUNT OF WATER LOST THROUGH THE SYSTEM <br />AND IDENTIFY, AT A MINIMUM, ALTERNATIVE SOURCES OF WATER FOR <br />AUGMENTATION. THE INFORMATION SHOULD BE SUPPLIED TO THE DIVISION <br />WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />STIPULATION N0. 5 <br />BASED ON VEGETATION COVER DATA INCLUDED [N THE APPLICATION, THE <br />REUEGETATION SUCCESS STANDARD FOR THE EASTSIDE MINE IS SET AT 35%. THE <br />VEGETATION COVER STANDARD OF 20% AS PROPOSED AND DISCUSSED ON PAGES 118 <br />AND 118A OF THE APPLICATION SHALL BE REVISED 'WITHIN ONE MONTH OF PERMIT <br />ISSUANCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.