Laserfiche WebLink
<br />The application contains a thorough <br />analysis of the proposed waste pile. <br />two alternative constructions for <br />applicant has proposed the "alternat <br />to transport water from the granular <br />feels that a pipe segment is not <br />permanent structure. <br />-32- <br />geotechnical investigation and stability <br />The applicant's consultant has presented <br />an underdrain beneath the pile. The <br />ive design", which includes a pipe drain <br />underdrain to the outfall. The Division <br />appropriate in the construction of a <br />The following stipulation is necessary: <br />STIPULATION N0. 9 <br />WITHIN THREE MONTHS OF PERMIT ISSUANCE, AND PRIOR TO INITIATION OF <br />CONSTRUCTION OF THE PROPOSED WASTE PILE, THE PERMITTEE WILL AMEND THE <br />WASTE PILE CONSTRUCTION PLAN SO AS TO ELIMINATE DISCHARGE OR COLLECTION <br />PIPES AS COMPONENTS OF THE SUBDRAIN SYSTEM. <br />With the acceptance of the above stipulations, the proposed operation is in <br />compliance with the requirements of this sections. <br />XVII. Coal Processing Waste and Non-coal Processing Waste -- Rules 2.05 3(8 <br />No coal processing is proposed in the application, therefore no coal <br />processing or non-coal processing waste will be produced at Eastside. <br />However, the applicant must address placement and storage and final disposal <br />of non coal waste such as lubricants, garbage, abandoned machinery, etc., as <br />required by Rules 2.05.4(2)(f) and 4.11.4. The following Stipulation is <br />necessary: <br />STIPULATION N0. 10 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE WILL SUBMIT A PLAN <br />FOR STORAGE AND DISPOSAL OF NON-COAL WASTE IN COMPLIANCE WITH RULES <br />2.05.4(2)(f) and 4.11.4 <br />With the acceptance of the above stipulation, the proposed operation is in <br />compliance with the requirements of this section. <br />XVIII. Mine Facilities, Coal Handling Strudtures and Support Facilities -- <br />RT2 6~3~~T. 2.03.3 an 4.0 <br />A discussion of mine facilities is presented on pages 82 through 101 of the <br />application. Existing facilities being used in the exploration operation <br />include the mine portals and yard area, equipment storage area, sediment pond <br />and an access road from County Road 237 to the portal area. The application <br />proposes realignment of the haul/access road, construction of office/ship <br />facilities near the junction of County Road 237 and the mine access road, <br />upgrading of the coal handling facilities {installation of a belt line and <br />enclosed screening facility), expansion of the coal stockpile area and <br />construction of the underground waste disposal area. <br />