My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35356
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:22 PM
Creation date
11/23/2007 8:17:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
General Documents
Doc Date
1/19/2006
Doc Name
Evaporation Pond & Pipeline Right-of-Way Grant
From
BLM
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan-18-2006 04:36pm From- <br />T-656 P.018/018 F-482 <br />19. All disturbed areas will be seeded with the following mixture. Application <br />rates sre for pure, live seed (PL6). <br />S ecies <br />Application Rate <br />~ / Acre PLS <br />Galleta, Diva <br />Indian xicegrass, Paloma <br />Western wheatgrass, Arriba <br />Crested wheatgrass, Nordan <br />Shadscale <br />1 <br />4 <br />5 <br />3 <br />1 <br />Prepare seedbed by contour cultivating four to six inches deep. Drill <br />seed 1/4 to 1/2 inch deep following the contour. In areas that cannot <br />be drilled, broadcast seed at double the application rate and cover 1/4 <br />to 1/2 inch deep with a harrow, drag bar, or chain. <br />20. The grantee shall notify the authorized officer at least 24 hours prior <br />to reseeding. Seeding must be completed after September 1 and prior to <br />October 15. <br />21. The area is considered to be satisfactorily reclaimed when: <br />A. All disturbed areas have been recontoured to blend with the natural <br />topography. <br />B. A11 soil erosion associsted with the operation has bean stabilized. <br />C. An acceptable vegetative cover has been established. An acceptable <br />vegetative cover will consist of a percent vegetative cover at <br />least equal to that present prior to disturbance, and a plant species <br />composition at least as desirable as that preaent prior to dis- <br />turbance. <br />Additional work shall be required until these conditions are satisfied. <br />Post Construction <br />22. A11 above-ground facilities with the exception of the fence shall be <br />painted dark green to blend with the surrounding area. <br />23. Pipeline location warning signs shall be installed within five days of <br />construction completion. Each sign shall be permanently marked with the <br />right-of-way serial number. <br />
The URL can be used to link to this page
Your browser does not support the video tag.