Laserfiche WebLink
=~-~_ <br />+ir. biil:e Savage <br />September 15, '_983 <br />Page Two <br />7. Preparation and submittal of annual hydrology report <br />and quarterly sedimentation pond inspection reports. <br />Phase note that all of the above activities will be <br />completed as soon as possible, but in no event later than <br />November 1, 1983. <br />I will be forwarding under separate cover a map depicting <br />all areas disturbed during the life of the Fiarr Strip Ido. ]. mine <br />and the current status of each area. If you have questions or <br />concerns, please get in touch with me at your convenience. <br />Sincerely, <br />,~~ ~~ <br />~.L ,~~~« <br />David R. Gossett <br />Chief Mining Engineer <br />DRG/lcy <br />cc: Mr. Richard C. Allen <br />h1r. James T. Cooper <br />Mr. Gerald t9. Grandev_ <br />Mr. James A. Larson <br />Mr. George V. Patterson <br />~\ <br />