Laserfiche WebLink
<br />RIVER ROAD (Hagie) PIT <br />M-91-136 <br />l.) The operator is reluctant at this time to propose a change to the reclamation plan that <br />would alter the existing planned configuration. It is possible that within two to three <br />years the use of the site may change from the current use. This may be caused by the <br />depletion of the neighboring Railhead Pit. If this does occur that soon, it is possible that <br />the original post-mining plan will be reverted to <br />For this reason, the operator has elected to commence with revegetation of the affected <br />area including the slopes around the mined area. This seeding has commenced as of the <br />last week of November, 1998. <br />We request an extension or your requirement that a revision to be submitted by December <br />1, 1998 so that additional information can be acquired, and some current planning can be <br />finalized. If we could have asix-month extension, until May 1, 1999, most of our <br />questions should be determined by that time. <br />I"0..,9, ~Ultl~~e~L..~- <br />Paul McGehee, Resource Manager <br />United Companies <br />Page 4 <br />