My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35219
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:18 PM
Creation date
11/23/2007 8:14:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978311
IBM Index Class Name
General Documents
Doc Name
HANDWRITTEN NOTES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY ov-cow <br />Department of Natural Resources ~ ,~'~_ <br />/~ ~ '~ <br />DenvehC080203Room 215 ~]~1 .~~~ ~~~~~-,: `r~G?' <br />Phone: (3031 866-3567 R ~/ ~ ~e~b <br />FAX: (303) 832-8106 ,p~ p 41993 M E M O. <br />Rov Rome. <br />Governor <br />DATE: December 31, 1992 Michael B.Long <br />' Oivrswn Duector <br />T0: Jim Stevens <br />~~~ <br />FROM: Tom Gillis~DG'~ <br />RE: n ecalculation & Stips,!Files M-78-311 d <br />~78-342. ~ ~~ D ~„ '~~ .~-~~ <br />Bot((((((h e~ were inspected onTj"`1"2/29/92 and both performance bonds <br />recalculated on 12/30/92. Both sites had significantly less <br />area disturbed and facilities on site than what was assumed to <br />be the case based on information contained in the permit files, <br />especially in the case of the Rawkeye Mine (M-78-311) which <br />does not appear to have been touched for a few decades. The <br />final bond amounts are both below the current amounts held by <br />the Division, as shown below: <br />ORIGINAL INITIAL RECALC. FINAL RECALC. <br />M-78-311: $ 5,000.00 $ 17,639.00 $ 2,895.00 <br />M-78-342: $ 5,000.00 $ 13,511.00 $ 4,957.00 <br />I have sent the new operator, David Blake of Blake Mining Co., <br />copies of the inspection reports, revised bond worksheets, and a <br />cover letter. I told Mr. Blake we could base the current bond <br />amounts on the existing disturbance and add a stipulation to the <br />permits that the bonds will need to be recalculated before the <br />mine can go active or any new disturbances are created. I made <br />an effort to fill out the appropriate coding forms (copies are <br />enclosed), however you should take a look at them as I am a <br />little rusty on coding form preparation. Please let me know if <br />this approach is appropriate and if there is anything elso I <br />need to do to finish following through on these permit actions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.