Laserfiche WebLink
distribution truck/trailer to the upper bench. 16 hours will be <br />guaranteed for machine time. Mobilization to the No. 5 mine site <br />(approximately 11 miles from Redstone) must be included in the <br />hourly rate. <br />REVEGETATION <br />Besides the outcast waste slope, approximately 2 acres, in total, <br />are in need of revegetation. In addition to the revegetation <br />requirements as outlined in the General Specifications book, Z <br />tons/acre of mulch will be uniformly worked into the areas to be <br />revegetated prior to fertilizer and seeding to an average depth <br />of 4". All surfaces to be worked for this phase of the bid are <br />well within an acceptable grade for drill seeding. Seed will be <br />provided by the State. <br />