Laserfiche WebLink
-2- <br />LIST OF STIPULATIONS <br />Stipulation No. 1: <br />THE APPLICANT MUST INSTALL MONITORING WELLS IN, <br />CONDUCT PUMPING TEST ON, AND MONITOR WATER LEVELS AND WATER QUALITY IN THE <br />ALLUVIUM OF DRY FORK, LICK CREEK, SOUTH PRONG AND HORSE CREEK ONE YEAR PRIOR <br />TO MINING WITHIN THE WATERSHEDS OF THESE STREAMS. THE APPLICANT SHALL SUBMIT <br />~/\ TO THE DIVISION THE DATA AND RESULTS OF THESE TESTS AND MONITORING ALONG WITH <br />PROJECTED IMPACTS PRIOR TO CONDUCTING MINING WITHIN ANY OF THE WATERSHEDS. <br />Stipulation No. 2: <br />IN ITS ANNUAL HYDROLOGY ASSESSMENT, THE APPLICANT <br />SHALL INCLUDE WATER QUANTITY DATA FROM THE U.S.G.S. SOMERSET MONITORING <br />Z STATION. SHOULD THE U.S.G.S. DISCONTINUE MONITORING AT THIS LOCATION, THE <br />2 OPERATOR SHALL SUBMIT ITS OWN QUANTITY MONITORING PROGRAM FOR THE NORTH FORK <br />OF THE GUNNISON. <br />Stipulation No. 3 <br />THE APPLICANT SHALL SUBMIT TO THE DIVISION COPIES OF THE REPORTS, EXHIBITS AND <br />ALL SUBSEQUENT AMENDMENTS SUBMITTED TO THE GUNNISON COUNTY PLANNING <br />2 COMMISSION, TITLED PROTECTION OF MINNESOTA CREEK WATER SUPPLY. <br />Stipulation No. 4: <br />ALL DATA AND REPORTS SUBMITTED TO THE STATE ENGINEERS OFFICE AND DITCH <br />COMPANIES SHALL BE COPIED TO MLRD AS INCLUSIONS WITHIN THE QUARTERLY REPORT <br />~I/ ~ REQUIRED UNDER SECTION 4.05.13(2) OF THE RULES AND REGULATIONS. <br />Stipulations No. 5 <br />NEITHER WEST ELK COAL COMPANY, NOR ANY SUCCEEDING OPERATOR OF THE MT. GUNNISON <br />\ PROJECT'S COAL LEASES AND RESERVES WILL BE PERMITTED TO MINE COAL WITHIN THE <br />MINNESOTA CREEK BASIN, UNTIL MLRD HAS RECEIVED A COPY OF AN ADJUDICATED PLAN <br />OF AUGMENTATION. <br />Stipulation No. 6 <br />THE APPLICANT SHALL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF INFLOWS, <br />DISCHARGES AND CONSUh1PTION OF WATER WITHIN THE MINE. TH[S REPORT IS TO <br />INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND QUANTITY OF INFLOWS, A <br />~ TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN THE SOURCE (I.E. FAULT, <br />FRACTURES, ETC), QUANTITY, DURATION, AND QUALITY (I.E. PH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A TABLE CONTAINING <br />RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN THE MINE, AND IMPORTED <br />FOR USE WITHIN THE MINE, A DISCUSSION OF THE WATER BALANCE WITHIN THE MINE, <br />AND FINALLY A PROJECTION OF HYDROLOGIC IMPACTS OF t4INING IN THE UPCOMING YEAR. <br /> <br />